- The 12mm of 3LPE coating was successfully executed. This special thickness coating is the first time in the world.
- Hochnag is propelling to make Fixed riser pipe and Tendon pipe.
Hochang successfully performed and delivered the LMU to Samsung Ship yard for Dalia project. This item shall stand 20,000 Ton. Therefore, the special fabrication system was applied on LMU.
Pull in sheaves for export lines are used during installation to pull the export into their receptacle. During towing they are in parking position along the hull, during installation they are in used position. Hochang produced and delivered this item to SHI.
Hochang successfully executed the receptacle for DALIA Project. Even though it is required High skills for fabrication, painting and detail engineering. However, Hochang delivered them to SHI in accordance with the required date.
Hocahng performed detailed engineering and reflect the expected problem during fabrication and assembly
prior to starting of steel cutting. This is a Hochang power based on well-experienced personnel capability.
[ Location drawings ]
The completed manufacturing drawing.- is shown as below;
The Greater Plutonio development, located in the deepwater offshore Angola , has proven resources in six fields(Cobalto, Cromio, Galio, Paladio, Platina and Pultonio) with an anticipated field life of 25 years. The Greater Plutonio project will initially develop the resources of five of these fields : Cobalto, Cromio, Galio, Paladio and Plutonio. Platina and other resources will be developed later An FPSO will be used as a hub processing the fluids produced from or injected into the subsea production and injection wells. The concept selected consists of a spread-moored FPSO, located south east of Paladio at a water depth of approximately 1399 meters, with all production, gas and water injection wells being subsea. HOCHANG is supplying many equipments for this project. ITEMS FOR GREATER PLUTONIO PROJECT
Recently, we are awarded a HANG OFF from Technip for DALIA project.

The IPB hang-off consists of two half-collars clamping the IPB end-fitting and bolted on legs collar and of 3 tubular legs supporting the legs collar on the top
l- tube flange.

Design life of the IPB hang off comes to 20 years.
HOCHANG, many engineers came from HHI and they have an experience about TENDON fabrication and detailed engineering. So, HOCHANG can perform and finish getting ready for Tendon project. We, Hochang, propel to be awarded Tendon Fabrication.
HOCANG have various special WPS and Quality system for Sub sea equipments.

As a good partner for Sub sea fabricator, we are making an effort to meet various requirements from Clients.

Hochang is trying to contact with a famous engineering company to product Subsea items.

In the year of 2005 year, we are faced with a turning point into sub sea equipment. Our confidence for sub sea equipment is based on various experiences through our reference lists since in 1994.
Especially, we have experience to attend the bidding of FLET & ITA ( Sub-sea item) FLET means Flow Line End Termination and ITA means In-Line Tee Assembly. It is necessitates the core technology of Sub-sea like special Coating, welding painting etc.,

We confirmed that all technical requirements could be met by Hochang and our sub-supplier's technology. In
fact, Hocahng can supply these equipments with competitive price and high-quality.

Hochang's dream is to attend a sub sea project as manufacturer. We are looking forward to getting a good
chance for us very soon.
Pull in sheaves for export lines are used during installation to pull the export into their receptacle. During towing they are in parking position along the hull, during installation they are in used position. Hochang produced and delivered this item to SHI.